Renewable Energy Plants, Wind Turbines, Hydroelectric Power Plants, Solar Plants, Biogas/Landfill Gas Power Plants, Biomass Boilers

Mankind’s accelerated and increasingly energy-dependent way of life will lead to the depletion of natural resources in the long term. Therefore, focus is shifting from fossil fuels to alternative, renewable and unlimited energy sources in energy production. ALTEO has significant competence in renewable energy sources and waste-based energy production. The Group’s portfolio covers all types of renewable energy production and includes 4 wind turbines, 2 hydropower plants, 1 biomass boiler and 4 alternative gas-fired power plants.

Wind turbines

2017.06.07

Ács wind turbine

Located outside the municipality of Ács, north of Motorway M1, ALTEO Group operates its VESTAS V90 wind turbine with a tower height of 105 m and an electrical output of 2 MW.
2017.06.07

Törökszentmiklós wind turbine

Located outside the municipality of Törökszentmiklós, 20 kilometres from Szolnok, in the heart of the Great Hungarian Plain, our Company operates a FUHRLÄNDER MD 70/77 wind turbine with a tower height of 100 m and an electrical output of 1.5 MW.
2017.06.07

Jánossomorja wind turbine

Located outside the municipality of Jánossomorja, 15 kilometres from Mosonmagyaróvár on the Little Hungarian Plain, ALTEO Group operates its VESTAS V90 wind turbine with a tower height of 105 m and an electrical output of 1.8 MW.
2017.06.07

Pápakovácsi wind turbine

Located outside the municipality of Pápakovácsi, 8 kilometres from Pápa, in the Bakony hills, ALTEO operates its VESTAS V90 wind turbine with a tower height of 105 m and an electrical output of 2 MW.

Solar plants

2017.12.09

Domaszék solar plant

At the beginning of December 2017, ALTEO Group closed the deal of acquiring Domaszék 2MW Kft. to become the owner of nearly 2 megawatt photovoltaic power plants at Domaszék near Szeged.

Hydroelectric power plants

2017.06.06

Gibárt hydroelectric power plant

The village of Gibárt lies in Borsod-Abaúj-Zemplén County along the Hernád River, 58 kilometres from the river mouth. Designed in 1901, built in 1902 and put into operation in 1903, a diversion-type hydropower plant can be found here.
2017.06.06

Felsődobsza hydroelectric power plant

The village of Felsődobsza lies in Borsod-Abaúj-Zemplén County along the Hernád River, 84 kilometres from the river mouth. Built in 1906, put into operation in 1911 and reconstructed in 2012-13, a diversion-type hydroelectric power plant is located here.

Renewable gas

2017.10.15

Nagykőrös Biogas Plant

ALTEO Group is operating the Nagykőrösi Biogas Plant since 1 January 2016 based on a long term O&M contract with Energigas Kft, the owner of the plant. The biogas plant uses 50,000-60,000 tonnes of agricultural and food industry waste, by-products and food that has expired.
2017.06.05

Debrecen Landfill Gas Power Plants I & II

The small power plant has a 625 kW installed electrical capacity and around 650 kW heating capacity and can sell the electricity it produces to MAVIR under the compulsory feed-in tariff system until the end of 2019.
2017.06.05

Nyíregyháza Landfill Gas Power Plant

This small power plant uses landfill gas released during the decomposition of organic waste stored in an area of the Nyíregyháza Regional Landfill Site for energy purposes. The small power plant has a 525 kW installed electrical capacity and around 600 kW heating capacity and was able to sell the electricity it produces to MAVIR under the compulsory feed-in tariff system until the end of 2016.
2017.06.05

Kisújszállás Small Associated Gas Power Plant

ALTEO concluded a long-term cooperation agreement with the Municipality of Kisújszállás for the energy recovery of waste gases associated with the municipality’s thermal spring water and implement an alternative heating solution based on that.

Biomass

2017.06.05

Tiszaújváros Biomass Boiler

Investment: Installation of a fluidised-bed biomass boiler and heat generation for the district heating system of the municipality of Tiszaújváros
Project company: Tisza BioTerm Kft.
Ownership: 60% ALTEO Group (Sinergy Kft.) and 40% GDHS Kft.
Investment amount: HUF 130 million
Project implementation period: 2012
Project implementation site: Tiszaújváros

With energy in mind.

FacebookTwitterLinkedIn