Located outside the municipality of Jánossomorja, 15 kilometres from Mosonmagyaróvár on the Little Hungarian Plain, ALTEO Group operates its VESTAS V90 wind turbine with a tower height of 105 m and an electrical output of 1.8 MW.
The power plant was delivered and put into operation in December 2008 and its owner, W.P.S.S. Energetikai Kft., was brought into our Group through acquisition in May 2012.