ALTEO’s 20 MW nominal capacity solar power plant on the outskirts of the village of Tereske in Nógrád County has been operational from the second half of 2024. The solar power plant, funded and constructed by the Company itself, can meet the electricity needs of more than 10,000 households per year. The reversible design of the power plant also serves sustainability, as the entire infrastructure can be removed at the end of its useful life, and the land occupied up to that point can be reused for agriculture.