Bábolna Wind Farm
2021.10.07
Since October 2024, ALTEO has been the owner of MOV-R Kft., which operates wind farms in Levél and Mosonszolnok. With the acquisition of 12 wind turbine towers at the two sites, with a total output of 24 MW and a capacity of 2 MW each, ALTEO’s capacity on the Hungarian wind farm market reached 71.5 MW. This brings ALTEO’s total renewable-based electricity production capacity to over 110 MW.

POWERING TOMORROW

FacebookTwitterLinkedIn